2 EOT Cranes in a hydroelectric plant2 EOT Cranes in a hydroelectric plant2 EOT Cranes in a hydroelectric plant
Descargas: 

2 EOT Cranes in a hydroelectric plant

Application
2 EOT Cranes in a hydroelectric plant

Country

Czech Republic

City

Dalešice

Representative office

Conductix-Wampfler s.r.o.

Operator

Hydroelectric plant Dalešice

Technical requirement

Main power supply for the EOT Cranes

Product [s]

Conductor Rail System, Program 0813 SinglePowerLine [Cu 500 A]

Collector

Double collector assembly

Length [system]
120 m

System course

Curved

Number of poles

3 + PE

Current

2 x 324 A [2 cranes, each 133.5 kW]

Voltage

400 V

Additional information

  • Conductor Rail mounted with a radius of 150 m [bending not neccessary anymore]
  • Vertical mounting of the Conductor Rails [horizontal collector insertion]