Recomendar
Eliminar archivo
¿Eliminar documento <span id="remove-document-name"></span> del <span id="remove-cart-name"></span>?
Reference Report
[REF0330-0002-E]
Application
Process-Overhead Crane in a steelwork
Country
Czech Republic
City
Plzeò
Representative office
Conductix-Wampfler s.r.o.
Operator
Pilsen Steel, a.s.
Technical requirement [s]
Power supply for 2 crabs of a Process-Overhead Crane
Product [s]
Festoon System "M-Line Program 0330"
Cable sag
1,5 m
Voltage
400 V
Travel distance [Load]
2 x 23,5 m
Travel speed [Load]
50 m/min
Environmental condition [s]
Steelwork
Additional information [s]
crab no.1: 250 t ; crab no. 2: 80/20 t
The fastest and strongest round or flat cable trolleys of the M-Line. Made of hot dipped galvanized steel for average speeds and higher loads with four-point suspension.
Main applications
1) depending on roller size/ roller material