Recomendar
Eliminar archivo
¿Eliminar documento <span id="remove-document-name"></span> del <span id="remove-cart-name"></span>?
Reference Report
[REF0300-0005-E]
Application
Tunnel lining machine
Customer
Herrenknecht AG Tunnelvortriebstechnik
Location
roadworks in tunnel (Moscow)
Travel length
up to 600 m
Travel speed
average of 10 m/day
Festoon System
(Heavy Duty) Program 340; 4 systems
Quantity of cable trolleys
182
Total weight of cable trolleys
23 to.
Specific features
Tunnel lining machine with 4 units which move with different speed and compensate a grade of 5%
Cable trolley with single or multi layer side-loading cable supports for flat cables. Suitable for medium mechanical and dynamic loads including traversing operation with lateral forces. Also suitable for short work cycles and high speeds.
Main applications
1) depending on roller size/ roller material