Estibador y recuperador

Copper Mine Conveying System (Stacker/ Conveyer Bridge)

Application
Machine for Prefabricated brick walls

Operator

Southern Peru Copper Corporation

Customer

MAN TAKRAF

Speed

10 m/min

Travel distance

8 m / 5 m

Loop depth
0,35 m / 0,5 m

Product

Round Cable Trolley in special design

Pivoting angle

+/- 120°

Environmental conditions

acidly

Specific features

Stainless steel - Operation: 24h/day, 7 days/week, 20 years