Our motor-driven reel, cable festoon, and TrenchGuard systems power a large gantry crane that handles low-level pumping equipment. The pumping system aims to help Nevada compensate for reduced levels at Lake Mead, Hoover Dam.
Updating the drive technology of motorized festoon systems and motor-driven cable reels. Conductix-Wampfler exchanges the discontinued Simovert Masterdrive converter units with the state-of-the-art Sinamics technology.
As with the Niagara Falls Incline Railway, our 0812 series conductor rail system is used on the Hornblower to power the climate control systems in each of the two 50-passenger funicular cars.
Conductix-Wampfler is now responsible for the supply of a total of 15 hybrid battery systems for RTG cranes and to retrofit an electrified E-RTG crane to a zero emission Full-Electric RTG crane (FE-RTG) by utilizing a battery pack.
Conductix-Wampfler will supply conductor rails and energy guiding chains on 15 overhead cranes for a major, global crane manufacturer for the Osborne South Development Project at the Osborne Naval Shipyard in South Australia.